The power plant includes four steam power generators each with a capacity of 156 MW, six gas turbine generator each with a capacity of 116 MW and three combined generator each with a capacity of 100 MW.
All units have received provisional acceptance certificate (PAC) by ANDISH SANAT team.

The Power Plant needed basic engineering overhaul according to the construction engineering calendar and also their new plan to increase the average efficiency by 7.5%
Also all the equipment must be disassembled and rechecked (turbine blades, disks, pumps, torques and etc.)